The Lewis team built this 2,728 car parking garage in 10 months at an existing casino - remarkable for a seven-story, cast-in-place, moment-frame structure. As the Designer-Builder, we managed the design process as well as construction. The team designed a user-friendly garage with a low cost per stall. Efficiency is impressive at 301 square feet per stall. We opened the first 300 spaces to the public just four months after construction began. This was possible due to cast-in-place construction, which ensured safety for patrons while concrete construction proceeded overhead.

 