• Project: Allen-Gates Hall
  • Location: Seattle, Washington
  • Client: Lakeside School
  • Architect: LMN Architects

After the very successful renovation of Bliss Hall, Lewis was hired to upgrade Allen-Gates Hall at Lakeside’s upper school.  Work at the building, which dates to 1986, included addition of an elevator, accessibility improvements, addition of a science lab, moving another lab, adding a classroom, upgrading building systems, and a new roof.

 
AllenGates1
  • AllenGates1
  • AllenGates2
  • AllenGates3
  • AllenGates4