EWEB-PV-Installation-right side sized.jpg
Lewis was hired by EWEB, an Oregon public utility, to build a new operations center that meets the requirements for LEED Gold certification, while demonstrating the agency’s commitment to energy efficiency, resource stewardship and fiduciary responsibility.
Kasier 1
Lewis recently performed simultaneous renovations to an in-patient pharmacy and laboratory at Kaiser Permanente’s Sunnyside Medical Center. Since both departments were located amidst an occupied hospital and remained fully operational during construction, stringent infection control practices were vital to maintaining critical operations and preserving a sterile environment to practice health care.  
West 8th 1
The 28-story West 8th office tower had an aggressive schedule to meet the owner’s pro forma. To achieve the schedule, we had to build the concrete core not just quickly, but in record time. LewisLEAN helped us dramatically speed the core construction – and achieve our fastest-ever rates for this construction type.
Bio-RadBIM2
Our upgrade of the occupied Bio-Rad Woodinville facility had to fit within a narrow time window due to Bio-Rad's manufacturing schedule, and the related FDA validation approvals they depend upon. Virtual Design & Construction / Building Information Modeling (VDC/BIM) sped the design and construction, eliminated wasted effort, and provided the certainty we needed.